A Groundwork company - serving Mesquite, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Wylie, TX

New Detached ADU in Wylie - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Mesquite
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a new detached ADU in Wylie, TX actually involves

A new detached ADU in Wylie typically runs $45,000 – $130,000 and takes four to seven months from the first stake in the ground to the final inspection, depending on size, finish level, and whether the lot needs utility trenching. It’s a standalone structure with its own foundation, roof, electrical service, and plumbing tie-in, so it’s a full build, not a room addition. For an exact number on your lot, call (888) 426-8078 and we’ll walk the site with you.

Call (888) 426-8078

How the build runs, stage by stage

A remodeled family room with new windows and a window seat

Detached ADUs go sideways when the sequencing is loose. Here’s the order we hold to, and where you’ll be making decisions along the way.

Stage 1: Site work and the slab (weeks 1 – 3)

Day one is layout and excavation, not framing. Wylie sits on blackland prairie clay that was pasture until recently, so we start with a soils review and set the pad height with drainage in mind. You’ll decide the building footprint and orientation at this stage, because it drives everything downstream. Pier-and-beam or a post-tension slab gets settled here, and that choice is not one to reverse later.

Stage 2: Utilities and rough-in (weeks 3 – 6)

Water, sewer, gas, and electrical get trenched from the main house to the ADU. This is the single biggest cost variable on most Wylie lots, because the distance from the meter and the depth to the sewer line aren’t always what the survey suggests. You’ll pick the electrical panel size and whether you want a separate meter here. Inspections happen before anything gets buried.

Stage 3: Framing, roof, and dry-in (weeks 6 – 10)

Framing goes up, the roof gets dried in, and windows and exterior doors go in. We build for hail in this part of North Texas, so roof decking and shingle class are choices worth pausing on. You’ll confirm exterior cladding and window selections in this window. Sheathing inspection and framing inspection both land in this stretch.

Stage 4: Mechanical, electrical, plumbing, and insulation (weeks 10 – 14)

HVAC, wiring, and plumbing rough-in happen behind the walls, then insulation and drywall. Rough-in inspections come before the walls close, and we don’t schedule drywall until they’ve passed. You’ll finalize fixture locations and outlet placement now, because after this point moving them costs real money.

Stage 5: Finishes, punch list, final inspection (weeks 14 – 20)

Cabinets, countertops, flooring, paint, and trim. This is where finish grade shows up most in the budget, and where you’ll choose between Silestone or Caesarstone surfaces, Moen or Kohler fixtures, and flooring type. Final inspection, then a walkthrough with you before we call it done. Every stage is covered by our 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between

Most of the cost swing lives in five decisions. Here’s the honest trade-off on each.

  • Slab type: Post-tension slab is the common Wylie choice for a detached structure on expansive clay and it holds up well with proper engineering. Pier-and-beam costs more upfront but makes future plumbing access easier. On former farmland, skipping the soils review is how slabs crack within a few dry summers.
  • Size: A 500 – 600 sq ft one-bedroom fits the low end of the range. Going to 900+ sq ft with two bedrooms and a full kitchen pushes toward the top. Every extra square foot carries foundation, roof, and mechanical cost with it.
  • Kitchen and bath finish grade: Stock cabinets and laminate counters land near the low end. Semi-custom cabinets with Silestone or Caesarstone quartz and Moen or Kohler fixtures push the number up but hold resale value better.
  • Utility distance: Short runs from the main house are cheap. Long trenching runs, or a grinder pump if the sewer line is too shallow, add real dollars and are often the surprise line item on a detached build.
  • Roof and cladding: Standard architectural shingles and brick veneer to match the main house are the safe, common pick. Metal roofing and upgraded cladding cost more but handle hail and heat better over a long horizon.

What a new detached ADU costs in Wylie, TX

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for a detached ADU here, with most Wylie builds landing in the $70,000 – $110,000 band for a one-bedroom with a full kitchen and bath. The range is wide because five variables move it: square footage, slab and foundation engineering required by the clay, the distance and depth of utility trenching, finish grade in the kitchen and bath, and how much of the permit and inspection scope the site requires.

A written estimate from us is line-item, not a lump sum. It covers site prep, foundation, framing, roof, mechanical rough-in, finishes, permits, and inspections. It typically does not cover landscaping restoration after trenching, HOA architectural review fees, or any utility upgrade the city requires beyond the meter. We tell you that upfront so nothing shows up mid-build.

Upfront pricing means the number you see is the number you pay. We also offer 0% financing for 18 months and $1,000 off projects over $10,000, which matters on a build this size. Call (888) 426-8078 for a free estimate and design consult.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Wylie homes specifically do to this job

Wylie grew from a small Collin County farm town into one of the fastest-growing Dallas – Metroplex suburbs, and that history shows up in every ADU build. Most of the ground here was pasture until recently, so it’s blackland prairie clay that has never been built on. That means slab and site-work decisions drive the project, not old-house remodeling. A slab poured like it’s sandy East Texas soil will crack within a couple of dry summers, so pier-and-beam or an engineered post-tension slab plus generous lot grading is non-negotiable on the 75098 lots we work.

The housing stock is mostly 2000s-to-present subdivisions with brick veneer, two-story homes, and post-tension slab-on-grade, plus a smaller core of mid-century ranch homes near downtown along FM 544 and Highway 78 where lot sizes and setbacks differ enough that the ADU placement changes. Wylie also sits in the hail-and-tornado belt, so hail-rated roofing and drainage away from the new structure are constant concerns. We check HOA architectural review rules early, because many Wylie subdivisions require approval before the city permit goes in, and that review adds time. This is part of a full Home Additions & ADU in Wylie scope if you’re also touching the main house, and our Home Additions & ADU service covers the broader build work. We cover Wylie and the surrounding area.

Serving Wylie, TX – Our Local Coverage Area

We serve Wylie and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – New Detached ADU in Wylie

A new stained cedar privacy fence

Get a free estimate for your Wylie ADU

A detached ADU is a real investment, and the estimate should be free and honest. Call (888) 426-8078 and a live person answers, day or night. We’ll schedule a site visit, review your lot’s soil and utility layout, and hand you a line-item written estimate with no surprises. If you’re also remodeling, homeowners often pair this with Kitchen Design & Layout in Wylie or Backsplash, Tile & Flooring in Wylie. Proudly backed by our 730-Day Done Right Promise.

Written by the team at Groundwork Construction Co.

Why Wylie Chooses Groundwork Construction Co. of Mesquite

We set the standard for new detached ADU in Wylie.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Wylie

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Wylie Customers Say

Trusted by homeowners across Wylie and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in niche

More services in Wylie

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Mesquite

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Mesquite team

A local vetted partner works across Mesquite and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Wylie?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Wylie.

(888) 426-8078

Request a Free Estimate in Wylie

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch