Tub-to-Shower Conversion in Princeton, TX: What It Costs and How Long It Takes
A tub-to-shower conversion in Princeton, TX typically runs $3,500 – $10,000 and takes 5 to 10 working days once materials are on site, with the demo and rough-in finished inside the first two days. The job means pulling the old tub, reworking the drain and valve to shower height, waterproofing the walls, setting a new pan or tiled base, and finishing with tile and glass. If you’re ready to price it, call (888) 426-8078 and we’ll schedule a free on-site estimate in your home, measure the alcove and give you a written line-item quote.
How a Tub-to-Shower Conversion Actually Runs, Day by Day

Every conversion follows the same five stages. What changes from house to house is how much the first stage turns up once the tub comes out. Here’s the sequence we work from.
Stage 1: Demo and inspection (day 1)
We protect the floors and haul the old tub out first thing. Then we remove the surround and open the valve wall to see what the drain, mixing valve and framing look like. On Princeton homes this is the stage where the surprises live, and we stop to show you what we found before spending another dollar. You decide then whether to repair the subfloor, replace the valve or open a wall further than planned.
Stage 2: Rough plumbing and rough-in (days 1 – 2)
The drain gets repositioned to the shower pan, and the valve body gets reset to a standard shower height so it sits at your chest, not your knee. If you’re adding a niche, a bench or a hand-held on a slide bar, the blocking goes in now, because it can’t go in later. You pick the fixture finish and the placement of the controls before we close this stage.
Stage 3: Waterproofing and inspection (day 3)
Backer board goes up, seams get taped and sealed, then a bonded waterproof membrane or a liquid membrane coats everything, including the corners and the curb. A shower pan needs a slow water test to check the membrane before anything covers it. This is the point where a mud-set pan earns its keep, and it’s the stage to prioritize if you want this bathroom to outlast the home.
Stage 4: Tile, fixtures and glass (days 4 – 8)
Wall tile, the base and the niche go in, then curing and grout, then the trim, shower head, drain cover and door. Glass is fabricated after measuring the finished opening, which usually means a few days between tiling and the door going on. You’ll confirm the tile layout, grout color, niche shelf and glass style before the boxes open.
Stage 5: Seal and walkthrough (days 9 – 10)
We seal the grout and stone, caulk the joints, test the valve and drain for flow, clean, and walk the room with you. You sign off, or we note the punch list and come back. The job isn’t done until the shower drains right, sits level, and you’ve run the water yourself.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make Between: Material and Configuration Specs
Most of the money in this job moves on four decisions. Here’s the honest trade-off on each.
- Acrylic or fiberglass one-piece pan and walls. The fastest install and the lowest cost, usually under $4,500 installed. It’s warm to the touch, low-maintenance and easy to clean. It also reads as basic, and a heavy drop or a hard scrub can dent or scratch it.
- Tile over a mud-set pan. The middle-to-upper end of the range, $6,500 – $10,000. It’s the most durable and most custom-looking option, and it’s repairable tile by tile. The trade-off is grout lines, which need care to stay clean, and a longer build (7 – 10 days).
- Linear drain vs. center drain. A center drain keeps costs low and fits most existing plumbing. A linear drain lets you use larger-format tile or a curbless entry, but it moves more plumbing and pushes the price by roughly $800 – $1,800.
- Frameless glass door or bypass slider. Frameless looks cleaner and holds the sight line better, but costs more than a framed slider. A hinged door needs clearance to swing; a slider is forgiving in a tight alcove.
- Niche, bench and grab bars. A niche runs a few hundred dollars and is worth every dollar in daily use. A bench and grab bars add $400 – $1,200 combined but matter a lot if a parent or grandparent uses the shower.
A showerhead from a name like Kohler fits the same rough-in as most others and holds up better over time. That’s the kind of part where the money is well spent.
What Tub-to-Shower Conversion Costs in Princeton, TX

In Princeton, a tub-to-shower conversion runs $3,500 – $10,000, and that range covers most of the work. Where you land depends on five things.
- Alcove size and configuration. A standard 60-inch alcove is the cheap end. A 48-inch or a short-turn tub space needs a custom pan, which adds roughly $600 – $1,500. A cast-iron tub weighs hundreds of pounds and costs more to remove than fiberglass.
- Existing condition behind the wall. Rot, soft subfloor, backed-out tile or a compromised valve can add $500 – $2,500 in repairs. We price these as a written separate line item, not a surprise on the final invoice.
- Moving plumbing or electrical. Relocating a drain or adding a light and vent pushes the number up. A valve replacement is small; a drain move is not.
- Material grade. A builder-grade acrylic insert sits at the low end of $3,500. A fully tiled shower with a mud-set pan and frameless glass lands at the top of $10,000.
- Permit and inspection scope. A straightforward swap on the existing drain is lighter paperwork than moving the drain or changing the supply layout. We pull the permit and carry the inspection in the quote.
What’s in a written estimate: demo, haul-off, rough plumbing, backer and waterproofing, setting materials, tile or surround, drain and valve trim, caulk and seal, permit and inspection, and our 730-Day Done Right Promise on labor and workmanship. What’s usually not in it: the glass door (quoted as a line item once the finished opening is measured), specialty stone, and any hidden-condition repairs we can’t see until demo day. The number you sign is the number you pay, so anything extra gets written in front of you before it happens. Estimates are free, and we’ll walk the room with you before leaving.
See the difference
Before
After
Before
After
Before
AfterWhat Princeton Homes Specifically Do to a Tub-to-Shower Conversion
Princeton (ZIP 75407) is Collin County farm-and-ranch country east of McKinney, and a good chunk of the homes we work on sit on former pasture. That comes with a specific set of issues. The blackland clay soil here expands when wet and cracks when dry, and it moves slabs and floors with it. In older ranch homes on acreage, we regularly open a tub wall and find a subfloor that’s not flat anymore, which means leveling is a real line item before a pan can be set. On the other end, the wave of new single-family subdivisions means we also work on recently built tract homes where the shower alcove is standard 60-inch and the plumbing is already in the right place, which usually keeps the job at the low end of the range. Cities in this stretch of Collin County move fast on permits, so we pull the permit before demo, not after, and we schedule the rough inspection before anything gets covered. Homeowners often pair this job with Metal Roofing in Princeton while we’re already on site, or with fresh Tile Roofing in Princeton on a farmhouse that needs both bathrooms and a roof redone. We cover all of Princeton, from the older acreage properties out toward the newer subdivisions.
Serving Princeton, TX – Our Local Coverage Area
We serve Princeton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Tub-to-Shower Conversion in Princeton

Five to ten working days from demo to final walkthrough, with demo and rough-in finished inside the first two. Acrylic inserts sit at the fast end, around 5 days; a fully tiled shower with a mud-set pan and custom glass runs closer to 10. Call (888) 426-8078 for a firm date range on your bathroom.
Yes, any change that touches the drain, valve, or supply lines needs a permit and a rough inspection before the walls close. A simple fixture swap on existing plumbing is the lightest version of the paperwork. We pull it and schedule both inspections as part of the job, so you’re not chasing the county. Call us with your address and we’ll confirm the scope.
Often yes. If the existing drain sits close to where the shower pan’s drain belongs, and the valve body can be reset at shower height, no plumbing moves. Roughly half the jobs we see land there. When the drain has to shift a foot or more, that’s a plumbing change with a plumbing line item, and we flag it at estimate time, not mid-job.
$3,500 – $10,000, with the low end going to a standard 60-inch alcove with a builder-grade insert and the high end going to a fully tiled shower with a mud-set pan, niche, bench and frameless glass. Hidden rot, a moved drain or a custom pan push you toward the top. Call (888) 426-8078 for an exact quote, free of charge.
Our 730-Day Done Right Promise covers labor and workmanship for two full years, which is one of the longest in the residential construction space. If the shower leaks, the grout cracks, or a drain doesn’t sit right, we come back and make it right. The number you sign is the number you pay, and the written estimate spells out exactly what’s covered.
Get a Free Tub-to-Shower Conversion Estimate in Princeton
Call (888) 426-8078 to schedule a free on-site estimate for a tub-to-shower conversion in Princeton. We’ll measure the alcove, check the valve and drain, and hand you a written line-item quote with a firm timeline, permit and inspection included. Calls are answered by a live person, 24/7. If your project is over $10,000, there’s $1,000 off, and financing at 0% for 18 months is available. We’ll also walk the wider scope with you if you want it done as part of a full Bathroom Remodeling in Princeton.
Our technicians have up to 12 years of experience. For a broader look at the scope of the work, read more about our Bathroom Remodeling service.
Written by the team at Groundwork Construction Co.