







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Bathroom Remodeling in Wylie, TX: What It Involves and What It Costs
Full bathroom remodeling in Wylie, TX typically runs $9,000 to $28,000 and takes three to six weeks from demolition to final walkthrough, depending on whether plumbing or walls move. A full remodel means gutting the room to the studs and rebuilding it: new tub or shower, tile, vanity, toilet, lighting, ventilation and flooring, with permits pulled and inspections passed. Call (888) 426-8078 for a free on-site estimate and a written line-item quote.
How a Full Bathroom Remodel Actually Unfolds

Most contractors describe a bathroom remodel as a blur of “we handle everything.” Here is the real sequence, stage by stage, so you know what’s happening in your house and when you need to make a decision.
Stage 1: Demolition and rough-in inspection (days 1 – 3)
We protect the path to the front door, then strip the room to studs and subfloor. The old tub, tile, vanity and drywall come out. If we’re relocating the toilet, sink or shower valve, the plumber and electrician rough in the new lines now. This is the messiest, loudest stretch, and it’s when the city inspector signs off on the rough plumbing and electrical before anything gets closed back up.
Stage 2: Framing, waterproofing and board (days 4 – 7)
We reframe any soft or rotted studs, set the cement backer board, and apply the waterproof membrane in the wet zone. You’ll confirm tile layout and grout color by now. Skipping the membrane is the number one reason showers leak into the room below, so we don’t rush it.
Stage 3: Tile and finish carpentry (days 8 – 18)
Floor tile, wall tile, shower pan and niche go in. Setting and grouting takes time because the thinset has to cure. Around the same time, the vanity cabinet, countertop template and any glass get ordered. You’ll pick your fixtures and finishes in stage 1 so lead times don’t stall the job.
Stage 4: Fixtures, paint and trim (days 19 – 25)
Toilet, sink, faucets, shower trim, mirror, light fixtures and exhaust fan go in. We paint, hang trim, and seal the room. The exhaust fan matters more than most homeowners expect in North Texas, because it pulls humidity out before it feeds mold behind the walls.
Stage 5: Final inspection and punch list (days 26 – 35)
The city inspector checks the finished plumbing and electrical work. We walk the room with you, fix anything on the punch list, and hand over care instructions. That’s also when your 730-Day Done Right Promise kicks in, in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Once the room is framed, the results come down to a handful of picks. Here’s what we walk through with Wylie homeowners, and the honest trade-off on each.
- Tile vs. luxury vinyl plank: Porcelain tile holds up to water and cleans easily but runs more per square foot and needs a solid subfloor. LVP is warmer underfoot and cheaper, but it can’t match tile’s resale appeal in a master bath.
- Tub-and-tile surround vs. a fully tiled shower: A tiled shower with a linear drain feels built-in and lasts decades, but costs more. A tub surround is faster and cheaper, though it looks dated sooner. (We handle walk-in showers on their own page.)
- Vanity grade: A stock cabinet gets you a functioning bath fast; a semi-custom or KraftMaid vanity gives you a real furniture look and better drawer hardware. The vanity itself runs $800 to $3,000, so this is a real budget lever.
- Ventilation: A builder-grade exhaust fan is cheap; a properly sized, quiet fan with a timer is the single best mold-prevention upgrade in a steamy North Texas bathroom.
- Countertop: Cultured marble is affordable; a Cambria or quartz top is more durable and reads as a premium finish.
What Full Bathroom Remodeling Costs in Wylie, TX

Expect $9,000 to $28,000 for a full bathroom remodel in Wylie. A standard hall bath lands near the low end. A master bath with a tiled shower, double vanity and relocated plumbing pushes toward the top. The number isn’t random; five variables drive it.
- Room size: A 40-square-foot hall bath and a 90-square-foot master are different jobs entirely.
- Existing condition: Water damage, soft subfloor or old galvanized pipes add demo and repair work.
- Moving plumbing, electrical or walls: Relocating a drain or adding a circuit means more labor and often a permit amendment.
- Material grade: Tile, vanity and fixture picks can swing the total by thousands.
- Permit scope: A cosmetic refresh may not need one; structural or plumbing changes do.
Our written estimate lists every line item so you see what’s included. Things that typically aren’t: hidden water damage, mold remediation, and structural repairs found after demo. We quote those only after we see them, never as surprises on the final bill.
See the difference
Before
After
Before
After
Before
AfterWhat Wylie Homes Specifically Do to This Job
Wylie’s housing stock shapes every full bathroom remodel here. Most homes we work on are 2000s-to-present single-family builds in subdivisions off FM 544 and Highway 78, sitting on post-tension slab-on-grade foundations poured into former blackland prairie clay. That clay expands in wet springs and contracts hard in dry summers, so a bathroom slab that’s cracked shows up as cracked tile and a shifting toilet base. In newer builds near the Wylie core, drywall and subfloor failures from a slow shower leak are common, and we routinely find damaged framing behind a twenty-year-old tub surround. Permits go through the city for any plumbing, electrical or structural change, and we pull them and pass inspection before closing walls. Wylie is part of the same hail-and-tornado belt, so homeowners often pair a bathroom project with Roof Repair in Wylie or a full Roof Replacement & Installation in Wylie while the crew is already on site. We cover all of Wylie and the surrounding towns, and our bathroom remodeling service is part of a full-scope lineup under Bathroom Remodeling.
If you’re planning a full bath refresh inside a larger project, Bathroom Remodeling in Wylie covers how we sequence the whole scope.
Serving Wylie, TX – Our Local Coverage Area
We serve Wylie and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Full Bathroom Remodeling in Wylie

Plan on three to six weeks. A straight gut-and-rebuild with no layout changes finishes near the three-week mark; moving plumbing or waiting on custom glass can push it to six. Call (888) 426-8078 for a realistic timeline on your room.
Yes, if the work touches plumbing, electrical or structure. A cosmetic swap of tile and fixtures usually doesn’t. We pull the permit and pass the inspection so your remodel is on record.
Yes, and it’s the most common path. Keeping the toilet, sink and shower in place keeps the budget near the $9,000 end and cuts the schedule. We can still update everything you see and touch.
Between $9,000 and $28,000 depending on size, layout changes and finishes. A master bath with moved plumbing and premium tile sits at the top. Call (888) 426-8078 for an exact line-item quote, free.
Every job carries our 730-Day Done Right Promise for two full years. If something isn’t right, we come back and fix it. That’s in writing before we start.
Get a Free Estimate for Full Bathroom Remodeling in Wylie
Call (888) 426-8078 to schedule your free on-site estimate. A live person answers, day or night. We’ll measure the room, review your options and hand you a written, line-item quote for full bathroom remodeling in Wylie with no surprises. From foundation to finish line, built to last and backed in writing.
Written by the team at Groundwork Construction Co.












