Vanities, Tile & Fixtures in Lucas, TX: What the Job Really Takes
Replacing a bathroom vanity, tiling a shower surround, and swapping out fixtures in a Lucas home typically runs $9,000 – $28,000 when tile and plumbing lines move, or $800 – $3,000 for a vanity-only swap. Most jobs finish in 3 – 7 working days once materials land. Call (888) 426-8078 for a free on-site estimate on your vanities, tile and fixtures in Lucas, and we’ll put real numbers to your bathroom instead of a vague ballpark.
How we sequence a vanity, tile and fixture job

On acreage properties around Lucas, we plan the whole job around one goal: finish it in as few trips as the work allows. Hauling a crew and material out to a multi-acre tract off a long driveway twice is a waste of your day and ours. So the sequence below is built to get demo, prep, and set done cleanly, with the homeowner making the key decisions up front rather than mid-job.
Day 1 – Demo and site protection. We pull the old vanity, disconnect the supply and drain lines, and strip the existing tile and backer down to the studs and subfloor. We protect the surrounding flooring and set up dust containment. This is also when we confirm what’s actually behind the wall: old shutoffs, a surprise vent stack, or framing that needs attention. You decide nothing today – we just report what we find.
Day 2 – Rough-in and substrate. If the layout is changing, the plumber moves supply and drain to the new vanity and shower valve location, and our electrician sets the GFCI circuit and vanity lighting. Then we hang and waterproof the cement backer board, tape and mud the seams, and roll on the waterproofing membrane. A 4 – 8 hour dry time lets the membrane cure before any tile goes up. You confirm final fixture box heights and outlet placement before we close the wall.
Days 3 – 4 – Tile setting. We lay out the field tile on the floor and walls, set the shower pan, and cut around the valve and drain. Large-format tile (12×24 and up) takes longer per piece but fewer grout lines to maintain. This is the stage where the visual decisions you made earlier either pay off or you wish you’d spent an hour longer on the layout. We dry-fit the pattern and get your sign-off before the thinset sets.
Day 5 – Grout and vanity install. Grout cures, then the new vanity gets set and leveled, the countertop dropped, the sink and faucet connected, and the drain trimmed to length. If you chose a freestanding or wall-hung vanity, the blocking went in on Day 2 so this goes fast.
Days 6 – 7 – Fixtures, trim, and walkthrough. The toilet goes back on, the showerhead, handle, and trim kit go in, and the mirror and lighting get hung. We caulk, clean, and walk the room with you. You sign off, and the 730-Day Done Right Promise starts from that day. Most Lucas jobs land inside a single week once material is on site; special-order tile or a custom vanity can add a week or two on the front end, which is why we lock material orders before demo starts.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
This is where a bathroom gets expensive or stays sensible, and it’s worth seeing the trade-offs side by side before you commit.
- Vanity construction – stock vs semi-custom vs custom. Stock cabinets cost the least and ship fast but come in fixed widths; semi-custom (KraftMaid is a strong middle path) lets you hit an exact wall length and pick door style, finish, and drawer layout for a moderate upcharge; full custom fits odd spaces and built-ins but adds several weeks and real cost. For most Lucas bathrooms, semi-custom is the sweet spot.
- Countertop – quartz vs granite vs cultured marble. Quartz (Cambria, among others) resists staining and needs no sealing; granite is durable and unique but wants periodic sealing; cultured marble is the budget pick and can chip at the edge over time.
- Floor and wall tile – ceramic vs porcelain vs natural stone. Ceramic is the lowest cost and fine for walls; porcelain is denser, tougher underfoot, and handles a wet floor better; natural stone (travertine, slate) looks great and demands sealing. Large-format porcelain cuts grout lines and reads cleaner in a small room.
- Shower wall system – tiled backer vs prefab panels. A tiled wall on proper waterproofing gives you a seamless custom look and lasts decades when installed right; prefab surrounds go in fast and cost less but show their seams.
- Fixtures – finish and function. Brushed nickel and matte black have overtaken chrome in popularity; a pressure-balance shower valve is the sensible standard, and a thermostatic valve adds precise temperature control for more money. Kohler and comparable lines hold up well on cartridges and finish.
- Glass and doors. A framed pivot door is the value choice; a frameless glass enclosure is the upgrade and makes a small bathroom feel larger. Mr-Glass and similar fabricators cut to the opening once tile is set.
What Vanities, Tile & Fixtures costs in Lucas, TX

The lead range for this work in Lucas is $9,000 – $28,000, with a vanity-only install at $800 – $3,000 and a shower retile running well inside the top end. Here’s what pushes a job toward the low or high number:
| Scope item | Typical range |
|---|---|
| Vanity install (single, stock to semi-custom) | $800 – $3,000 |
| Tile floor and shower surround, standard porcelain | $3,500 – $9,000 |
| Full vanity, tile and fixture package (mid-grade) | $9,000 – $18,000 |
| Full package with layout change and premium tile/stone | $18,000 – $28,000 |
- Size of the room. A 5×8 hall bath and a 10×12 primary bath are different jobs; square footage of tile drives material and labor.
- Whether plumbing or electrical moves. Keeping the vanity and shower valve where they are saves the rough-in labor and the inspection that comes with it.
- Material grade. A $3/sq ft porcelain and a $15/sq ft natural stone differ mostly in material, plus a bit more labor for stone and its sealing.
- Existing condition. Rotted subfloor, a failing pan, or old galvanized shutoffs add repair line items you can’t see until demo.
- Permit scope. A cosmetic swap may need no permit; moving plumbing or electrical does, and the inspection adds a step and a fee.
A written Groundwork estimate itemizes demo, rough-in, tile, vanity, fixtures, and permit line by line, and the price is the price. What it excludes: structural repairs discovered mid-job (we quote those before touching them), and any material upgrades you request after sign-off.
See the difference
Before
After
Before
After
Before
AfterWhat Lucas homes specifically do to this job
Lucas is a small, semi-rural Collin County town (ZIP 75002) built on large-lot custom homes and acreage tracts north of Wylie and Allen, and that shapes a tile-and-vanity job in ways a tight subdivision never does. For one thing, the expansive Blackland Prairie clay under most of these properties shrinks and swells with our wet-dry cycles, so slab movement is a routine concern. Before we set tile on a bathroom floor here, we check for deflection and cracking; a floor that’s out of plane from foundation movement will telegraph through tile if the substrate isn’t corrected first. That’s a step suburban crews often skip because the ground closer to central Collin County doesn’t move the same way.
The other wrinkle is the property itself. Many Lucas homes are on well and septic, so we coordinate water shutoffs and drain work around systems that aren’t city-supplied, and we plan material deliveries for long driveways and outbuildings. We work on newer custom builds and older rural homesteads in the same week, which means reading both 2020s construction and decades-old framing. For tile and fixtures, older homesteads often need shutoffs upgraded and the subfloor leveled before anything new goes down; new builds mostly need precise layout. We cover all of Lucas from the eastern acreage tracts to the homes closer to the Wylie line, and homeowners here often pair interior bathroom work with Tile Roofing in Lucas when hail season has done a number on the exterior – the same project calendar. Some also line up Specialty Roofing in Lucas while we’re already scheduling trades. If the bathroom is part of a bigger plan, that rolls into Bathroom Remodeling in Lucas, and you can see our full Bathroom Remodeling service for the wider scope. We handle jobs throughout Lucas and the surrounding area.
Serving Lucas, TX – Our Local Coverage Area
We serve Lucas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Vanities, Tile & Fixtures in Lucas

Most jobs finish in 3 – 7 working days after materials are on site. A vanity-only swap is often a single day; a full retile with new fixtures runs about a week. Special-order tile or a custom vanity can add one to two weeks of lead time before demo starts. Call (888) 426-8078 for a schedule built around your job.
You need a permit when the work moves plumbing or electrical – relocating a drain, adding a circuit for a new vanity light, or changing a shower valve location. A straight cosmetic swap of tile and a same-spot vanity often doesn’t require one. We tell you which applies and pull the permit and pass the inspection as part of the job. Call (888) 426-8078 to talk through your scope.
Yes, and it’s the most common job we run. Keeping the vanity, toilet, and shower valve where they sit trims the rough-in labor and usually skips the inspection, which pulls the price toward the low end of the $9,000 – $28,000 range. Layout changes are doable, they just cost more and take longer. Call (888) 426-8078 for an exact quote.
The full package runs $9,000 – $28,000 depending on room size, whether plumbing moves, and material grade; a vanity install alone is $800 – $3,000. Premium tile and layout changes push toward the top. Call (888) 426-8078 for a written, itemized estimate – it’s free.
Every vanities, tile and fixtures job is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That covers our workmanship for two full years, not a 90-day handshake. The number you see on the estimate is the number you pay, and financing at 0% for 18 months is available. Call (888) 426-8078 to get started.
Ready for a straight answer on your bathroom?
We’ll come to your Lucas home, measure the room, look at what’s behind the wall, and hand you a written, itemized estimate for your vanities, tile and fixtures – free, with no pressure and no vague ballpark. A live person answers (888) 426-8078 any hour, any day, and most jobs get scheduled within a week. Upfront pricing, permits handled, backed in writing.