What does a full bathroom remodeling in Sunnyvale, TX involve and cost?
Full bathroom remodeling in Sunnyvale, TX runs $9,000 to $28,000 and typically takes three to six weeks once demolition starts. That covers a complete tear-out and rebuild of one bathroom: new tile, new fixtures, new vanity, lighting, ventilation, and a finished shower or tub surround. Call (888) 426-8078 for a free on-site estimate with a written line-item scope before anyone touches a wall.
How a full bathroom remodel actually runs, stage by stage

Most contractors describe a full bathroom in a single sentence and then disappear. Here’s the honest version, with the order and the timing we hold ourselves to.
Stage 1: Scope and rough-out drawings (week 1)
We meet on site, measure the room, and check what’s behind the walls. You decide at this point whether the layout stays put or moves, because moving a drain or a supply line changes both the price and the permit. Most Sunnyvale jobs land on a full-finish remodel without relocating plumbing, which keeps the schedule short and the budget predictable.
Stage 2: Permits and demolition (days 1 to 3)
Once the scope is signed we pull the permit, then protect the floors and demo. Trim and drywall come out, the old tub or shower pan goes, and we open the wall around the plumbing to inspect it. You’re deciding tile and fixture selections at this point, before anything gets set. Expect two to three days of demo for a standard bathroom with no structural surprises.
Stage 3: Rough-in trades and inspection (days 3 to 8)
Plumbing, electrical, and ventilation go in together, then we call for rough inspection. This is where a job either stays on schedule or stalls, and it’s why the permit matters. We schedule the inspection early and don’t close the walls until it passes. Nothing in this stage is something you should attempt on your own: plumbing and wiring work behind a bathroom wall is where a small mistake turns into a water leak or a shock hazard, and it’s why we use licensed professionals for every rough-in.
Stage 4: Cement board, waterproofing, and tile (days 8 to 18)
The wet area gets cement board and a bonded waterproofing membrane before a single tile goes up. This is the part you’ll never see and the part that decides whether the shower survives ten years. Tile setting runs a week or more depending on the pattern. Long-format tiles or herringbone takes longer than a simple grid, and you’ll want to know that upfront.
Stage 5: Fixtures, finishes, and final walkthrough (days 18 to 26)
Vanity, toilet, faucets, glass, mirror, lighting, and paint all land here. We do a water test, a drain test, and a final inspection, then walk you through every finished surface. Any punch-list item gets handled before we call the job done. The 730-Day Done Right Promise backs the workmanship for two full years from that walkthrough.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that actually shape the finish
Once the room is open, every decision you make is a trade-off between cost, how it holds up, and how it looks. Here’s how we talk through them on site.
- Shower base vs. curbless tiled pan: a pre-formed base costs less and installs faster; a curbless tiled pan looks better and adds labor and waterproofing cost. Curbless suits aging-in-place plans well.
- Tile grade: porcelain holds up to North Texas humidity and cleans up easily; natural stone looks richer but needs sealing every couple of years.
- Vanity and counter: a stock cabinet runs a fraction of a custom piece; a solid-surface or quartz top outlasts laminate on a wet vanity every time. Kohler fixtures hold up well and are a common pick here.
- Ventilation: a properly sized exhaust fan is not optional in a humid North Texas house. Cheap fans fail early and leave moisture where it shouldn’t be.
- Window and glass: existing bath windows often don’t meet modern expectations for privacy or energy, and swapping one is a good time to consider a Therma-Tru or ES Windows unit while the wall is open.
We list the actual products and the actual price of each on the estimate, so you’re choosing between numbers, not guessing.
What full bathroom remodeling costs in Sunnyvale, TX

The honest range for a complete bathroom remodel in Sunnyvale is $9,000 to $28,000. Where a job lands depends on five things.
- Room size: a hall bath and a primary bath are two different budgets.
- Existing condition: hidden rot, old galvanized pipe, or a slow drain from a slab issue adds real cost.
- Moving plumbing or electrical: relocating a toilet or a shower drain pushes toward the top of the range.
- Material grade: porcelain and stock cabinetry sit at the low end; stone, custom vanities, and frameless glass sit high.
- Permit scope: a full remodel that touches plumbing and electrical pulls a bigger permit than a cosmetic refresh.
Every estimate we write is line-item and fixed. The number you see is the number you pay, and the $1,000 off projects over $10,000 applies here, along with 0% financing for 18 months if you want to spread the cost. Call (888) 426-8078 to get your free estimate.
See the difference
Before
After
Before
After
Before
AfterWhy Sunnyvale bathrooms are a different job
Sunnyvale is a small, affluent town on the eastern edge of Dallas County, mostly large-lot and custom homes on acreage, and that building stock changes this job in a few ways. The permitting office runs on its own rhythm, quieter than Mesquite or Garland but just as strict, and we schedule around it because a missed inspection stalls the whole bathroom. Older custom homes on the town’s rural edges sometimes sit on a slab with movement from the expansive clay soil underneath, and that shows up as a cracked shower pan or a floor that’s out of level before we ever start. We check for it during the walkthrough, because it’s cheaper to fix before tile goes down.
Serving Sunnyvale, TX – Our Local Coverage Area
We serve Sunnyvale and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked about full bathroom remodeling in Sunnyvale

Three to six weeks from demo to final walkthrough, depending on tile pattern and any structural surprises. Most Sunnyvale jobs land near the four-week mark. Call (888) 426-8078 for a schedule built around your scope.
Yes, if the work touches plumbing, electrical, or ventilation, which a full remodel almost always does. We pull the permit and schedule the inspections ourselves. Call (888) 426-8078 and we’ll walk through what a full remodel on your address requires.
Yes, and most Sunnyvale full remodels keep the existing layout. Changing fixture placement adds cost and permit scope, so we recommend it only when the layout is genuinely a problem. Call (888) 426-8078 to talk through what a same-layout remodel would look like.
No. Our estimate is fixed and line-item, and hidden rot or a shifted slab gets flagged and priced before demolition continues, never after. Call (888) 426-8078 for the no-surprise number.
Every full bathroom remodeling we do is covered by the 730-Day Done Right Promise. If it’s not done right, we make it right, for two years. Call (888) 426-8078 to hear how that applies to your project.
Get a free estimate on your full bathroom remodeling in Sunnyvale
Call (888) 426-8078 for a free on-site estimate on your full bathroom remodeling in Sunnyvale. A live person answers the phone, 24/7, and we’ll schedule a time to walk your bathroom, measure it, and send you a written line-item scope with a fixed price. No pressure, no surprises, just the number and the schedule.