What Full Bathroom Remodeling in Garland, TX Involves – and What It Costs
Full bathroom remodeling in Garland, TX, typically runs $9,000 – $28,000, covers a complete gut of the room down to studs and subfloor, and takes three to five weeks of working time. That range assumes we relocate at most one fixture and the existing plumbing rough-in is sound. If your Garland ranch home is opening up a wall for the first time, the number can climb. Call (888) 426-8078 and we’ll talk through your specific room before anyone swings a hammer.
How We Run a Full Bathroom Remodel, Start to Finish

A full bathroom remodel is a sequence, not a weekend project. Getting the order wrong is how a Garland homeowner ends up with a finished tile floor and no working shower valve. Here’s the actual rhythm of the job.
Stage 1: Demolition and inspection (days 1 – 3)
We pull the fixtures, strip tile, remove the vanity and toilet, and take the room to studs. This is where surprises surface. In Garland’s older single-story brick ranches, we regularly find galvanized supply lines near the end of their life, or a vent stack that’s been slowly rotting a stud. We photograph everything and walk you through what we found before quoting any additions. You decide at this point whether to replace the rough plumbing or patch and move on.
Stage 2: Rough-in work (days 3 – 7)
Plumbing, electrical, and any structural changes happen now, before a single tile is set. If you’re moving the shower valve to the opposite wall or adding a heated floor circuit, this is the window. We open walls once, run everything, and call for the rough inspection so the work is signed off before it gets sealed behind drywall. You’ll want your fixtures selected by now because trim and rough-in dimensions are tied to what you’ve chosen.
Stage 3: Permits and rough inspection (mid-week)
Garland runs its own permitting and inspection program rather than deferring to Dallas County, so the timeline is set by the city, not by us. We schedule the rough inspection, meet the inspector on site, and correct anything flagged before closing up walls. This stage often eats two to four business days of calendar time that isn’t construction time.
Stage 4: Board, waterproof, and tile (days 8 – 18)
Cement board goes up, we waterproof the wet zone, and tiling begins. Large-format tile runs faster to set but demands a flatter substrate. Small mosaic on a shower floor is slower. This is the visual payoff stage, and it’s also where your grout and grout-line width decisions from earlier finally show up in real life. Most homeowners want to look at the room daily. We get it.
Stage 5: Trim, fixtures, and final inspection (days 18 – 25+)
Vanity, toilet, glass, mirror, lighting, and paint land in this window. Then the city returns for the final inspection. You walk through with us, punch list in hand, and we don’t call the job done until the list is clear. Your written 730-Day Done Right Promise covers the workmanship from that day forward.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Shape a Full Bathroom Remodel
Most of the buyer’s decisions come down to a handful of upgrades with very different long-term stories. Here’s the honest version.
- Tile body vs. porcelain vs. natural stone. Porcelain and ceramic are forgiving, water-resistant, and fit most budgets. Natural marble and travertine look remarkable but need sealing and stain more easily. A full natural-stone shower can add real money to the tile line item.
- Shower system. A pressure-balanced valve is the safe default. A thermostatic valve with dual heads costs more up front and gives you precise temperature control. If you’re replacing the shower entirely, the plumbing rough-in cost is different from a simple trim swap.
- Vanity and cabinet spec. Stock cabinetry from a partner line like KraftMaid is straightforward and budget-friendly. Semi-custom gets you the width and door profile the room actually wants. Sink and faucet grade from brands like Kohler sit on top of either.
- Ventilation. A properly sized exhaust fan is not optional in a Garland bathroom that sees humid summers. Undersized fans are one of the leading causes of premature paint and drywall failure, and we see the damage on plenty of remodels.
- Flooring. Heated tile floor adds comfort but also a dedicated circuit. If your 1950s ranch still has a fuse-era panel, that circuit is a real decision, not a throwaway.
What Full Bathroom Remodeling Costs in Garland, TX

Our typical full bathroom remodel in Garland lands between $9,000 and $28,000 when the room is a standard hall or primary bathroom on a sound slab. Five variables push you toward the high end.
- Room size and layout. A 5×8 hall bath costs less than a 10×10 primary with dual vanities. Every square foot carries demo, substrate, tile, and fixtures.
- Existing condition. Age of the rough plumbing, hidden rot, and foundation movement under the floor are the most common wildcards on Garland homes from the 1950s and 60s.
- Relocating plumbing or electrical. Moving the toilet, sink, or shower valve means new drain and supply lines. Every relocation adds hours and material.
- Material grade. Tile, fixtures, and cabinetry are where a $9,000 job becomes a $28,000 job most often.
- Permit scope. A cosmetic refresh and a full gut with rough-in changes don’t require the same paperwork. The permit line item is real, and we pull permits – we don’t skip them.
Our written, itemized estimate shows material allowances, labor, permit fees, and contingency as separate lines. What isn’t typically in the base bid: foundation repair if slab movement is discovered, and any structural framing change requiring an engineer. We flag those before work begins so there are no change orders.
See the difference
Before
After
Before
After
Before
AfterWhat Garland Homes Specifically Do to a Full Bathroom Remodel
Garland is a post-war streetcar suburb grown into a full city, and its building stock splits along a construction-era line that changes this job directly. In the older core (75040, 75041, 75042) we’re walking into 1950s and 60s single-story brick ranches where the original slab sits on Blackland Prairie clay that swells and shrinks between wet springs and dry summers. That movement shows up under tile. A floor that looked flat at walkthrough can have a cracked substrate once we pull the old finish, and we’ve learned to check the slab before bidding. In the farther 75044 and 75043 additions we’re working on 1970s-90s construction with firmer subfloor and newer systems, though the same clay underlies the slab. Garage conversions are also a recurring pattern around the older neighborhoods, and the undersized electrical service on many of those homes (100-amp or fuse-era panels) turns a seemingly cosmetic bathroom into a service upgrade decision. Garland permits and inspects its own work, so we build city inspection days into the schedule rather than treating them as an afterthought.
Serving Garland, TX – Our Local Coverage Area
We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Bathroom Remodeling in Garland

Most full bathroom remodels in Garland run three to five weeks from demo to final inspection, with two to four business days lost to city inspection scheduling. The calendar stretch is almost always in the front half, while we’re waiting on plumbing, electrical, and inspection rather than on tile. Call (888) 426-8078 for a firm schedule after we see the room.
Yes, if the work touches plumbing, electrical, or structural elements, a Garland permit and inspections are required. Cosmetic-only work (paint, tile over existing substrate, fixture swap) may not need one, but anything behind the wall does. We pull the permit, meet the inspector, and handle corrections as part of the job.
Almost always, and that’s how most Garland jobs stay near the low end of the $9,000 – $28,000 range. Keeping the toilet, shower valve, and vanity drain in their existing locations avoids rough-in work and the associated permit scope. If you’re moving a wall or relocating the shower, expect a larger project.
Expect $9,000 – $28,000 for a standard full bathroom remodel in Garland. Small hall baths with modest materials come in near $9,000. Primary baths with natural stone, custom cabinetry, and relocations run higher. Call (888) 426-8078 for an exact quote after a free on-site estimate.
Every Groundwork Construction Co. full bathroom remodel in Garland is covered by our 730-Day Done Right Promise. If the workmanship fails within that window, we come back and make it right. The materials themselves carry their own manufacturer warranties, and our written estimate lists them.
Ready to Price Your Full Bathroom Remodeling in Garland?
A free on-site estimate is the right next step for a bathroom project in Garland. We walk the room, check the slab and rough-in, and put together an itemized written number you can actually act on. Call (888) 426-8078 and a live person will schedule your visit. Financing at 0% for 18 months is available, and projects over $10,000 get $1,000 off. Nobody quotes anything until we’ve seen the room.
Written by the team at Groundwork Construction Co.