A Groundwork company - serving Mesquite, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Full Bathroom Remodeling · Sachse, TX

Full Bathroom Remodeling in Sachse - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Mesquite
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A galley kitchen opened up to the dining room with a new peninsula
A remodeled family room with new windows and a window seat
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Bathroom Remodeling in Sachse, TX: What the Job Really Involves

Full bathroom remodeling in Sachse, TX typically costs $9,000 to $28,000 and takes three to five weeks of on-site work once permits clear. That means a full gut of the wet zone: demo down to studs and slab, new plumbing rough-in, electrical, waterproofing, tile, fixtures, and a finished shower or tub surround. It’s not a cosmetic refresh – it’s a rebuild of the most failure-prone room in the house. Call (888) 426-8078 for a free on-site estimate with a written line-item scope.

Call (888) 426-8078

How a Full Bathroom Rebuild Actually Runs, Stage by Stage

A tile setter installing wall tile in a shower

We sequence bathroom work tightly because every stage depends on the one before it. Here’s the real order, and what you’ll be deciding and when.

Days 1-2: Demo and site prep

We protect the floors and hallways, shut off water, then take out the old tub, vanity, toilet, tile, drywall, and any rotten subfloor. On a 1980s or 1990s Sachse home, that’s often where we find the first surprise: old framing that never got a proper vapor barrier. You decide nothing here. We photograph everything we uncover and flag any structural or plumbing problem before we go further, so nothing gets added later without your sign-off.

Days 3-6: Rough-in plumbing, electrical, and inspections

New supply lines, drain and vent work, and the electrical circuits for lighting, exhaust fan, and any heated floor go in now. If the layout is changing – moving the toilet, adding a second sink – this is when it happens, because once the slab or subfloor closes up, you don’t want to reopen it. This is the stage that triggers a municipal rough-in inspection, so timing depends on the inspector’s schedule, not just ours. Your decision here: fixture locations and whether the lighting plan is set.

Days 7-9: Waterproofing and backer board

This is the stage that separates a bathroom that lasts from one that leaks. We install cementitious backer board or a bonded waterproofing membrane in the entire wet zone, not just behind the tile, and we flood-test the pan before tile goes down. A lot of failures we get called to fix in Sachse start with a builder who skipped this step. No owner decisions – but you’re welcome to walk the site before tile begins.

Days 10-16: Tile, grout, and finish carpentry

Wall tile, floor tile, grout, and sealing, plus baseboard and any wainscoting or trim. Tile work is the longest single stage and where material choice has the biggest visual payoff. Decisions here are yours at the front end: tile size, layout, grout color, and whether you’re doing a curb or curbless shower. Those choices should be locked before demo, because changing tile mid-job resets the schedule.

Days 17-21+: Fixtures, glass, and final inspection

Vanity set, toilet, faucets, shower valve trim, lighting, mirrors, and the shower glass go in last. Then the final inspection, a full water test, and a walkthrough with you. Allow a few extra days for glass fabrication, since measured shower enclosures typically take one to two weeks to be cut and delivered.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options Sachse Homeowners Actually Choose Between

Most of the cost spread on this job comes down to four decisions. Here’s the honest trade-off on each.

  • Tile material. Porcelain is the workhorse: dense, water-resistant, and it handles North Texas humidity without issue. Natural stone (marble, travertine) looks warmer and ranks higher on resale appeal, but it needs sealing every year or two and shows water spots. Large-format tile cuts grout lines and looks cleaner; small hex or subway tile costs more in labor because there’s more setting and grout work.
  • Shower configuration. A standard alcove tub-and-tile surround is the least expensive and fastest to install. A walk-in shower with a curb is next. A curbless, fully tiled shower with a linear drain is the premium option and the one that requires the most careful slab and framing work in a Sachse home.
  • Vanity and countertop. Stock cabinets with a quartz or solid-surface top are the value play. Semi-custom cabinetry (KraftMaid is a partner brand we work with) lets you fit the exact wall and adds drawer organization. Stone tops like Cambria quartz won’t stain or need sealing, and cost more than laminate.
  • Fixtures and finishes. Kohler and similar mid-tier brands hold up well and carry replaceable cartridges, so a faucet you can repair beats a budget one you’ll replace. Heated floors, a steam unit, and a smart exhaust fan (one that senses humidity and runs to clear it) are the most common upgrades for a primary bath.

What Full Bathroom Remodeling Costs in Sachse, TX

A new multi-panel patio door opening a kitchen to the patio

Plan on $9,000 to $28,000 for a full bathroom remodel in Sachse, with the midpoint landing around $15,000 to $18,000 for a typical hall or primary bath. Five things push a job toward either end:

  • Size and bathroom count. A 40-square-foot hall bath sits near the low end; a 100-square-foot primary with a double vanity and separate shower sits at the top.
  • Existing condition. Rotten subfloor, old galvanized or polybutylene plumbing, or a slab that’s shifted adds real cost. This is where the clay soil under Sachse shows up in a bathroom budget.
  • Moving plumbing, electrical, or structure. Relocating the toilet, adding a circuit, or removing a wall to enlarge the room adds labor and permit scope.
  • Material grade. Porcelain and stock cabinets versus natural stone and semi-custom cabinetry can swing the number by thousands.
  • Permit scope. A straight fixture swap-out may not need a permit; moving plumbing or electrical does, and that adds inspection time and fees.

A written estimate from us is line-itemed: demo, rough-in, tile, fixtures, permits, and haul-away, each with its own number. What it doesn’t cover, unless we call it out in writing, is hidden damage found after demo and any change you make after materials are ordered. Upfront pricing means the number you see is the number you pay for the scope as written. Call (888) 426-8078 for a free estimate.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Sachse Homes Specifically Do to This Job

Sachse sits on the Blackland Prairie clay that runs under much of the eastern Dallas suburbs, and that single fact changes how bathroom work here gets done. That clay holds moisture through the winter and cracks open in summer, so a slab that looks level in March can show movement by August. On a bathroom, that means a floor that’s out of level can crack tile if the substrate isn’t corrected first. We check the slab and subfloor before tile ever goes down, and we prep for it rather than tiling over a problem.

The housing stock matters too. Most Sachse homes are suburban single-family, built from the 1980s through the 2000s, with brick-veneer tract and custom homes on slabs. That era means original plumbing and often 1990s-era vanity and tile, and the most common repair we find is moisture around the shower pan and the toilet flange. If your bathroom work is part of a full Bathroom Remodeling in Sachse plan that also touches the exterior, we can time it around it. If you’re covering more of the house, our Bathroom Remodeling service handles the wider scope, and we also work across Sachse for related exterior jobs. Storm damage that reaches the roofline often comes up alongside bathroom leaks, and homeowners often pair this with Roof Repair in Sachse or a full Roof Replacement & Installation in Sachse when the leak source is up top.

Serving Sachse, TX – Our Local Coverage Area

We serve Sachse and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Full Bathroom Remodeling in Sachse

A new stained cedar privacy fence

Get a Free Full Bathroom Remodeling Estimate in Sachse

Call (888) 426-8078 and a live person answers around the clock. We’ll set a time to walk your bathroom, measure the space, check the slab and subfloor, and talk through layout and materials. You’ll leave the visit with a written, line-itemed estimate and a realistic schedule – no pressure, no vague numbers. Projects over $10,000 qualify for $1,000 off, and 0% financing for 18 months is available.

Written by the team at Groundwork Construction Co.

Why Sachse Chooses Groundwork Construction Co. of Mesquite

We set the standard for full bathroom remodeling in Sachse.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sachse

Getting your full bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sachse Customers Say

Trusted by homeowners across Sachse and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodel

More services in Sachse

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Mesquite

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Mesquite team

A local vetted partner works across Mesquite and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Full Bathroom Remodeling in Sachse?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sachse.

(888) 426-8078

Request a Free Estimate in Sachse

Tell us about your full bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch