







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Bathroom Remodeling in Lucas, TX: What It Involves and What It Costs
A full bathroom remodeling in Lucas, TX runs $9,000 – $28,000 and typically takes four to six weeks from demo to final walkthrough. “Full” means the whole room comes out: tub, shower surround, vanity, toilet, flooring, tile, lighting, and usually some of the drywall. You’re rebuilding the wet wall and the layout, not just swapping finishes. Call (888) 426-8078 and a live person picks up, day or night, to get your free on-site estimate on the calendar.
How a Full Bathroom Remodel Actually Runs, Stage by Stage

Bathrooms are small rooms with a lot packed into them, so the sequence matters more than most homeowners expect. Here’s the real order of operations on a Lucas job, and what you’ll be deciding at each stop.
Stage 1: Site protection and demolition (days 1 – 3)
We seal off the room, tape plastic over doorways, and lay floor protection through the path to the front door. Then everything comes out: fixtures, tile, backer board, vanity, toilet, and any drywall that’s hiding water damage. On two- to three-week jobs you’ll have one working bathroom elsewhere in the house during this stretch, so plan that now. You’d have picked your tile and fixtures before demo day, not after.
Stage 2: Rough-in and inspection (days 3 – 7)
Plumbers and electricians move the real guts: valve positions, drain locations, exhaust fan, GFCI outlets, and recessed lighting over the vanity. If you’re relocating the toilet or turning a tub alcove into a larger shower footprint, this is the expensive part and it happens here. In Lucas, we pull the plumbing and mechanical permits before any of this opens up, and the inspection has to pass before walls close. Nothing is covered up until it’s signed off.
Stage 3: Waterproofing and substrate (days 7 – 11)
Cement board on the walls, a bonded waterproofing membrane in the shower, a pre-sloped pan or a foam shower base, and RedGard or a comparable liquid membrane over the wet zones. This is the stage homeowners never see and the one that decides whether the shower leaks in year four or year fifteen. You won’t make a decision here unless we find rot or a soft subfloor, in which case we send photos and a written line-item for approval before proceeding.
Stage 4: Tile, flooring, and finish carpentry (days 11 – 25)
Floor tile first, then walls, then grout and sealing. After that the vanity, countertop, mirror, toilet, and trim. This is the longest stretch and the one where your finish choices land on the wall. If your tile has a running-bond or herringbone pattern, add two to four days; those layouts cost more in labor and there’s no honest way around it.
Stage 5: Glass, plumbing trim, punch list (days 25 – 32)
Shower glass gets templated after tile is set, so expect that lead time baked into the last week. Plumbers set the trim and test everything, electricians install the fan and confirm GFCI operation, and we walk the room with you with a punch list in hand. Most Lucas jobs land in that four-to-six-week window, and the range is schedule, not surprises.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
Almost every decision in a full bathroom remodel trades money against longevity. Here’s the honest version of each choice, so you can pick with your eyes open.
- Tile material: Porcelain is the workhorse at $4 – $12 per square foot installed, holds up to North Texas humidity, and comes in large-format slabs that read modern. Natural stone (marble, travertine) runs $12 – $30+ per square foot installed, needs sealing every year or two, and can etch from shower products. It’s beautiful. It’s also a maintenance commitment.
- Shower base versus mud-set pan: A pre-made acrylic or foam base is faster and cheaper, installed in a day. A mud-set pan with a tile floor is more work but lets the floor match the walls and holds up to heavy use for decades.
- Vanity grade: Stock cabinets from a big-box store are budget-friendly but vary wildly in particleboard quality. Semi-custom in a moisture-resistant build (KraftMaid, for instance) costs more upfront and holds up far better in a humid bathroom. Under $3,000 installed for the low end, up to $3,000 at the top for the vanity alone.
- Ventilation: A standard 50-CFM ceiling fan is fine in a small room. A bath with a big shower really wants 110 CFM or more, ducted to the exterior, not into the attic. Cheap fans rust out in three years and take the drywall with them.
- Fixtures: Kohler and comparable brands are worth the small premium on valves and trim, because those are the parts that fail first. Cheap cartridges leak behind the wall where you can’t see them.
- Flooring: Large-format porcelain with minimal grout lines is easiest to keep clean. Heated floors are a $600 – $1,500 add-on and worth it if you run cold in the winter.
What Full Bathroom Remodeling Costs in Lucas, TX

The range is $9,000 – $28,000 for a full bathroom remodeling project in Lucas, and the biggest driver is what’s behind the wall, not what tile you pick. A cosmetic refresh at the bottom of that range swaps fixtures and flooring in a room with sound plumbing. A top-of-range job moves the toilet, relocates the drain, reframes a wall, or opens up a tub-to-shower conversion while tiling floor to ceiling in natural stone.
Five variables push the number up or down:
- Room size: A 40-square-foot hall bath and a 100-square-foot primary bath are not the same job. Tile and labor scale with square footage.
- Plumbing relocation: Moving a drain in a slab-on-grade home means cutting concrete. That’s real money, typically $1,500 – $4,000 extra, and it’s why we always ask before assuming the layout stays put.
- Existing condition: Water damage, mold, a rotted subfloor, or knob-and-tube electrical all surface during demo. We photograph it, send a written change order, and get approval before touching it. No mystery line items at the end.
- Material grade: Porcelain and stock cabinets vs. natural stone and semi-custom cabinets can swing the same room by $6,000 – $8,000.
- Permit and inspection scope: A full re-pipe with new mechanicals costs more in permit fees than a finish-only remodel. Every job that touches plumbing or electrical gets a permit pulled in Lucas.
Your written estimate is line-itemed: demolition, plumbing, electrical, tile labor, material allowances for each fixture, permit fees, and haul-away. What’s usually not included: structural repairs discovered mid-demo, specialty glass (templated after tile, quoted separately on some builds), and finish carpentry outside the bathroom. Every job carries our 730-Day Done Right Promise, and pricing is locked at the written estimate. No-hassle upfront pricing, the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Lucas Homes Specifically Do to This Job
Lucas (ZIP 75002) is a small, semi-rural Collin County town, and the housing stock here shapes a bathroom job in ways you don’t see in the tighter subdivisions of neighboring Wylie or Allen. Most of what we work on sits on multi-acre tracts: large-lot custom homes with detached shops, barns, and outbuildings. That means longer driveways for material delivery, and it means checking the water source first. If a property is on a well and a septic system, plumbing scope gets a site check before demo because the rough-in has to account for the well pressure and the drain field, not just the city supply line.
The Blackland Prairie clay under much of Lucas is the other factor. That soil swells and shrinks with our wet and dry cycles, and foundation movement here shows up inside a bathroom as cracked tile, hairline drywall cracks that reopen after every heavy rain, and shower doors that suddenly don’t close square. We check for that movement during the estimate so we’re not tiling over a floor that’s still shifting. It’s also why slab and pier-and-beam work is a routine concern here in a way it isn’t on the sandier ground closer to central Collin County. If a bathroom redo is part of a wider scope, see our Bathroom Remodeling in Lucas page for how the smaller jobs fit in. Homeowners in the acreage properties along the western edge of town often pair this with Roof Repair in Lucas, since hail season here does a number on those same homes.
We cover Lucas and the surrounding Collin County area, including Wylie, Sachse, Princeton, and Garland. Our technicians have up to 12 years of experience, are background-checked, and arrive in uniform. If you’re planning a larger remodel that goes beyond the bathroom, we also handle Roof Replacement & Installation in Lucas, and our Bathroom Remodeling service handles smaller conversions and refreshes that don’t need the full tear-out.
Serving Lucas, TX – Our Local Coverage Area
We serve Lucas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Bathroom Remodeling in Lucas

Four to six weeks is the realistic window for a full bathroom remodeling in Lucas, from demo day to final walkthrough. Simple layouts with no plumbing relocation run closer to four weeks. Jobs that move the toilet, cut into a slab, or order templated glass run five to six. Give us a call at (888) 426-8078 and we’ll walk your specific room through the timeline.
Yes, if the job touches plumbing, electrical, or mechanical systems, which almost every full remodel does. We pull the permits, coordinate the inspections, and don’t cover a wall until the inspector signs off. That’s a legal requirement and a protection for you on resale. Call (888) 426-8078 for an estimate that includes the permit line item.
Usually, yes, and you’ll save $1,500 – $4,000 by keeping the toilet and drain in place. If the layout already works, we modernize everything visible and leave the rough-in where it is. If it doesn’t, moving a drain in a slab home means cutting concrete, which is a real cost. We can tell you which path makes sense after we’ve seen the room. Call (888) 426-8078 to schedule your free estimate.
Most full jobs land between $9,000 and $28,000, with a small bathroom around $5,000 – $12,000 if the scope shrinks. Room size, plumbing relocation, existing damage, material grade, and permit scope are the five things that move the number. Call (888) 426-8078 for a line-itemed written quote, and ask about the $1,000 off on projects over $10,000 and 0% financing for 18 months. Estimates are free.
Every full bathroom remodeling project we complete is covered by our 730-Day Done Right Promise. If something we installed isn’t right, we come back and make it right, for two years from completion. That’s one of the longest workmanship guarantees in the residential construction space. Call (888) 426-8078 for the full written warranty terms before you sign anything.
Get Your Free Full Bathroom Remodeling Estimate in Lucas
When you call (888) 426-8078, a real person answers, any hour of the day, and gets you on the schedule for a free on-site estimate. We walk the room, measure, check the plumbing and electrical, and hand you a line-itemed written quote with fixed pricing and no change-order surprises. Ask about our 0% financing for 18 months and the $1,000 off projects over $10,000. Call (888) 426-8078 today.
Written by the team at Groundwork Construction Co.












