Tub-to-Shower Conversion in Garland, TX: What It Costs and How Long It Takes
A tub-to-shower conversion in Garland typically runs $3,500 – $10,000 and takes 3 to 6 working days once materials are on site. The job means removing the tub, reworking the drain and valve rough-in, waterproofing a new shower pan and walls, then setting tile and glass. The wide range comes down to size, tile grade, and whether the drain has to move. Call (888) 426-8078 for a free on-site estimate.
The Process, Stage by Stage

This is where most estimates go wrong, so it helps to know exactly what a conversion involves before anyone hands you a number. Here’s how we run the job.
Stage 1: Site check and measurements (about 1 hour, before the job)
We confirm the tub alcove dimensions, the drain location, the valve type, and whether the wall framing behind the surround is sound. In Garland’s older ranches, this is also where we find out if the existing valve is a two-handle unit that needs replacing, and whether the drain sits off-center in the slab. The homeowner decides alcove versus walk-in configuration at this stage.
Stage 2: Demolition and rough-in (day 1 – 2)
We pull the tub, remove the surround and backer board, and open the wall to the studs around the valve. On a slab home, the drain gets cut and rerouted to the new shower center. This is when plumbing and any framing work happens, and it’s the dirtiest two days of the job. Tile selection needs to be locked in by the end of this stage so material isn’t the delay.
Stage 3: Waterproofing and inspection (day 3)
A shower lives or dies by its waterproofing. We install a bonded membrane over the pan and up the walls to at least the showerhead height, then run a flood test to confirm the pan holds. Where a permit is required, the rough plumbing and waterproofing get inspected before tile goes up. The homeowner makes a final call on niche placement and bench or seat options here.
Stage 4: Tile and finish (day 4 – 5)
Wall tile, floor tile, grout, and any accent band go in. Grout cures before glass is installed, which is why the timeline doesn’t compress. Standard ceramic and porcelain take a full setting day plus cure; natural stone adds a day for sealing. Homeowner picks grout color and finish at the start of this stage, not after.
Stage 5: Glass, fixtures, and walkthrough (day 5 – 6)
Glass panels or doors, the showerhead and trim, and the final caulk line go in. Then we walk the job with you, check the pan drains correctly, and confirm the valve handles and temps. That walkthrough is where the 730-Day Done Right Promise gets explained in plain terms: if a leak or a tile issue shows up later, we come back and fix it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
Almost every decision on a conversion comes down to four or five real trade-offs. Here’s what we walk Garland homeowners through:
- Acrylic or fiberglass surround vs. tile. A prefab surround runs toward the low end of the $3,500 – $10,000 range and installs in two or three days. It’s durable and easy to clean but looks like a prefab. Tile costs more and adds a day or two, but it holds resale value and lets you match the rest of the bath.
- Ceramic/porcelain vs. natural stone. Porcelain is the workhorse: dense, low-maintenance, forgiving of North Texas water. Natural stone (travertine, marble-look) costs meaningfully more and needs periodic sealing, which matters in a house that sees hard water.
- Alcove shower vs. curbless walk-in. A curbless entry looks great and works for aging-in-place, but it usually means recessing or rebuilding the floor structure and drives up the permit and labor cost.
- Framed vs. frameless glass. Frameless glass is the visual upgrade most people want. It costs more and needs the tile set plumb, so it’s a coordination cost as much as a material one.
- Moving the drain or not. Keeping the drain in place is the single biggest lever on price. Centering it under a new shower means cutting slab or moving a joist bay, which is real money.
What Tub-to-Shower Conversion Costs in Garland, TX

Plan on $3,500 – $10,000 for a tub-to-shower conversion in Garland, with most jobs landing around the middle of that band. Five things move the number:
- Shower footprint. A standard 60-inch alcove stays toward $3,500 – $6,000. Widening into a full walk-in pushes the top.
- Existing condition. Rotten framing, a failed valve, or a slab that needs exploratory cutting adds hours and material.
- Drain and plumbing relocation. This is the biggest swing, sometimes $1,500 or more on its own.
- Tile and glass grade. Builder porcelain with framed glass to natural stone with frameless glass can roughly double the tile-and-glass line.
- Permit scope. Plumbing and structural changes pull a permit and inspection; a like-for-like swap may not.
A written estimate spells out demo, rough-in, waterproofing, tile, fixtures, glass, and cleanup as separate lines, with no change orders unless you approve them. What it typically doesn’t include is the bath fan upgrade, any unexpected structural repair, or tile you haven’t picked yet. Upfront pricing, no surprises: the number you sign is the number you pay unless you ask for something new.
See the difference
Before
After
Before
After
Before
AfterWhat Garland Homes Specifically Do to This Job
Garland is a post-war streetcar suburb grown into a full city, and its building stock splits sharply along a line of construction era. Near the original subdivisions around downtown and the older core in ZIPs 75040 and 75041, you’re walking into 1950s-60s single-story brick ranches. Those homes still run undersized electrical service and can carry slab plumbing that’s been patched and re-patched. Out toward 75042 and the newer additions, you’re in 1970s-90s and later brick-and-frame homes with different framing and drain layouts. Knowing which decade of code and systems you’re walking into before we bid is half the expertise on this job. Garland also runs its own inspections and permitting rather than deferring to Dallas County, so a conversion that moves the drain needs the right plan set. And the Blackland Prairie clay under these homes expands and contracts between wet springs and dry summers, which occasionally shows up as cracked pan tile or a shifting shower floor. Pair this with Tile Roofing in Garland and you’re covering the two places your home takes the most weather.
Serving Garland, TX – Our Local Coverage Area
We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in Garland

Most conversions take 3 to 6 working days from demo to final glass, with the longer end coming from drain relocation or natural stone. Order tile early so material doesn’t stall the job. Call (888) 426-8078 for a schedule based on your actual bath.
A permit is generally required when the job moves plumbing, changes the drain, or alters structure, and Garland permits and inspects through its own department. A like-for-like swap often doesn’t need one. We’ll tell you which bucket your job falls in before work starts.
Yes. Keeping the existing drain and valve location is the most common and most affordable path, and it’s what keeps conversion cost down toward $3,500 – $6,000. We only recommend moving plumbing when the layout or a code issue forces it.
Expect $3,500 – $10,000, depending mostly on footprint, drain relocation, and tile and glass grade. The written estimate breaks every line out. Call (888) 426-8078 for a free quote on your specific bath.
Every conversion is covered by our 730-Day Done Right Promise: if a leak, a tile issue, or a finish problem shows up within that window, we come back and make it right. That’s backed in writing, not just promised.
Get a Free Estimate on Your Conversion
Call (888) 426-8078 and a live person answers, day or night. We’ll set a time to walk your bath, measure the alcove, check the drain and valve, and hand you a written line-item estimate for your tub-to-shower conversion in Garland. No pressure, no surprise change orders. Estimates are free.
Written by the team at Groundwork Construction Co.