Cabinets & Countertops in Garland: What the Job Actually Costs and How Long It Runs
New cabinets and countertops in Garland typically run $14,000 – $45,000 for a full kitchen’s worth, with cabinet installation alone at $4,000 – $13,000 and countertops at $2,000 – $6,500. Most Garland jobs are done in three to five working days once materials are on site, though the ordering window in front of that is usually four to six weeks. Call (888) 426-8078 to get a written line-item number for your kitchen before you commit to anything.
How we run a cabinet and countertop job, start to finish

Garland has a lot of homeowners who work on their own properties, keep their own tools, and don’t want a crew dragging a two-week job out of a one-week scope. That shapes how we sequence this work. Five stages, with a clear decision at each one.
Stage 1: Measure and final layout (day 1, about two hours)
We measure the actual walls, not the room’s advertised dimensions. In Garland’s older single-story ranches, walls are rarely plumb and floors are rarely level, and on the clay soils under most of this city the slab has usually moved at least once. This is where you lock the cabinet line, the appliance openings, and whether the sink stays put. Once this is signed off, the order goes in.
Stage 2: Demo and prep (day 1 – 2)
Old cabinets come out, the wall surface gets repaired, and we check what’s behind them. This is the honest part of the job: if the 1960s wiring behind the range wall isn’t grounded, or the shutoff valve under the sink won’t close, you find out here rather than after the countertop is glued down. You decide whether to correct it now or note it for later.
Stage 3: Cabinet install and leveling (day 2 – 3)
Bases go in first, shimmed and scribed to the wall, then uppers. Crown and light rail go on if you’re using them. You’ll walk the room at the end of this day and confirm door swing, drawer clearance, and that the dishwasher opening is actually the width the spec sheet said. Door and drawer fronts get adjusted here, not at the end.
Stage 4: Template and countertop fabrication (day 3, then a shop gap)
We template the installed cabinets with a physical jig, which is why the counters fit and the overhang is even. Fabrication runs several days to two weeks depending on the material and edge profile. You decide the edge, the sink cutout, and where the seam lands on a longer run. The kitchen is usable during this gap, just without counters.
Stage 5: Countertop set, plumbing, and punch (final day)
Stone goes in, the sink and disposal get reconnected, and we run the final punch list with you in the room. Backsplash is a separate scope on this job and has its own page, so we’ll flag it here and quote it separately rather than folding it into the number.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
Most of the money in this job sits in three decisions. Here’s the honest trade-off on each, without steering you toward whatever’s easiest to order.
- Stock vs. semi-custom vs. full custom cabinets. Stock sizes are the cheapest and fastest, and they fit a rectangular kitchen well. Semi-custom, which is where brands like KraftMaid sit, lets you adjust depth and width in small increments and pick the finish, and it’s the sweet spot for Garland’s older homes where nothing is a standard dimension. Full custom buys you an exact fit and a longer lead time and price.
- Quartz vs. granite vs. laminate. Quartz is non-porous and needs no sealing, which matters in a North Texas kitchen where the summer humidity swings. Granite is natural stone with real variation and requires periodic sealing. Laminate has improved enough that it’s a legitimate choice for a rental or a flip, and it costs a fraction of stone.
- Box construction and drawer hardware. Plywood boxes hold up to moisture and time better than particleboard. Soft-close undermount drawer glides are worth the upgrade on a kitchen you’ll use daily; they’re the first thing to fail on builder-grade cabinets.
- Sink and faucet configuration. A single-basin undermount is easier to clean and takes a bigger pot. A double basin suits people who wash by hand. Decide this before templating, not after.
- Prefab modular systems. Some homeowners ask about panelized and prefab options from names like Boxabl or Plant Prefab for accessory structures; for a kitchen inside an existing Garland house, stick-built cabinetry wins on fit almost every time.
What cabinets and countertops cost in Garland, TX

A full kitchen’s cabinets and countertops in Garland land between $14,000 and $45,000, and the spread is almost entirely about material grade, layout changes, and what’s hiding behind the old cabinets. Line-item ranges:
- Cabinet installation: $4,000 – $13,000
- Countertop installation: $2,000 – $6,500
- Kitchen island installation: $3,000 – $10,000
- Backsplash installation: $800 – $2,500 (quoted separately)
- A smaller or partial kitchen scope: $9,000 – $20,000
The five things that push a job toward the high end: square footage and cabinet run length; whether the layout moves (relocating a sink or range means plumbing and electrical work on top of the cabinets); the condition behind the walls; cabinet grade; and whether the electrical service is adequate. That last one is the big one in Garland, and the next section explains why.
A written estimate from us covers demo, cabinet supply and install, countertop template and fabrication, sink and disposal reconnect, haul-away, and permit fees where a permit is required. It doesn’t cover backsplash tile, new appliances, or unexpected structural or electrical corrections, though we price those in writing before doing them. The number on the estimate is the number you pay. Projects over $10,000 also carry $1,000 off, and 0% financing for 18 months is available.
See the difference
Before
After
Before
After
Before
AfterWhat Garland homes specifically do to this job
Garland is a post-war streetcar suburb that grew into a full city, and its housing stock splits along a construction-era line. Around the older core in 75040, 75041 and 75042, near downtown and the original 1950s and 60s subdivisions, you’re working in single-story brick ranches with original framing, original wiring, and slabs that have been moving on Blackland Prairie clay for sixty-odd years. Out toward the newer master-planned additions in the northern and eastern ZIPs, you’re in 1970s to 90s brick-and-frame homes where the cabinets are tired but the bones are more modern.
That split matters on a cabinet job, because in the older ranches the hidden cost is almost always the electrical service. A kitchen that still runs on a 100-amp panel, or a fuse-era box, can’t carry a modern range, dishwasher, disposal and microwave without an upgrade, and that’s a real line item you’ll want in the bid, not discovered mid-job. Layer on a city that runs its own permitting and inspections rather than deferring to the county, and the sequence gets tighter: a cabinet replacement is generally cosmetic, but move a sink, add an island with a receptacle, or change the range location and you’re into permitted work with an inspection window.
We work Garland regularly, from the streets off the downtown square out through the Duck Creek corridor, and the questions are the same. Is the wall plumb? Is the panel big enough? Where does the counter seam land? Answer those before you order, and the job runs in one trip.
If the cabinets are the first step in something wider, you may be looking at Kitchen Remodeling in Garland, and homeowners often pair this work with Walk-In Showers & Shower Remodeling in Garland or a Tub-to-Shower Conversion in Garland while the house is already torn up. We also cover the wider metro through our Garland service area, and our Kitchen Remodeling service covers the full-scope version.
Serving Garland, TX – Our Local Coverage Area
We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: cabinets and countertops in Garland

Three to five working days on site, plus a four-to-six-week ordering and fabrication window in front of it. The on-site time is cabinet demo and install in two to three days, a template visit, then the countertop set and final punch on the last day. The gap is materials, not labor, so the sooner you sign off the layout, the sooner the job starts.
Usually not, if you’re keeping the layout. A straight cabinet and countertop swap with no plumbing, electrical or structural changes generally doesn’t require a permit. Move the sink, add an island with power, or change the range location and it does, and the city inspects that work. We pull the permits and pass the inspections when they’re required, and we tell you at the estimate which side of that line your job falls on.
Yes, and it’s the most common way we do it. Keeping the sink and range where they are holds the price down and keeps the job out of permit territory. If the layout is genuinely bad, though, you’re better off fixing it once; we’ll price both versions so you can see the real difference.
$14,000 to $45,000 for a full kitchen, with cabinet installation at $4,000 – $13,000 and countertops at $2,000 – $6,500. Smaller scopes start lower, and an island or a service upgrade pushes it up. Call (888) 426-8078 for an exact quote on your kitchen; the estimate is free.
Every project is covered by our 730-Day Done Right Promise: if something isn’t right, we come back and make it right. That’s on top of the manufacturer warranties on the cabinets and the countertop material. Our technicians have up to 12 years of experience, and they arrive background-checked and in uniform.
Get a written number for your Garland kitchen
Call (888) 426-8078 to schedule a free on-site estimate for cabinets and countertops in Garland. A live person answers around the clock, and on the visit we measure the room, check the panel and the walls, and hand you a line-item price with the material choices spelled out. No change orders later. Just a real number you can plan around.